Leading PVC Manufacturer Streamlines Supply Chain Operations with SAP S/4HANA and 3PL Warehouse Integration

Client Snapshot

Profile

This company is a leader in India’s manufacturing sector with an annual PVC pipe production capacity exceeding 370,000 metric tons.

 

Client Situation

The client wanted to implement a supply chain transformation to manage 150 daily truckload movements, combining advanced warehousing solutions, cutting-edge technologies, and a strategic partnership with a 3PL provider.

 

Work Performed

Protiviti analyzed, developed and implemented a comprehensive integration of the SAP S/4HANA system with third-party logistics (3PL) warehouse management systems (WMS), protecting critical data and optimizing the client’s supply chain performance.

 

Outcome/Benefits

With data synchronization between S/4HANA and the 3PL WMS, the client is now handling high volumes of data, including inventory movements, sales orders, and purchase orders. Data accuracy significantly improved, SAP system load during peak periods was reduced, and error management was streamlined.

 

Effective inventory management is a cornerstone of modern supply chain optimization. By enabling real-time tracking, accurate stock level measurement, instant data updates, and actionable insights into stockouts and slow-moving products, efficient warehousing plays a pivotal role in maintaining a balanced inventory and mitigating associated risks. Recognizing the need to enhance supply chain efficiency, this client – a leading manufacturer of PVC pipe in the booming Indian market – sought a solution in third-party logistics (3PL) warehousing. With an ambitious target of managing 150 full truckload movements daily, a robust, real-time integration between the company’s ERP system and the 3PL warehouse management system (WMS) was imperative.

Integrating SAP S/4HANA with a 3PL warehouse system

The client had integrated S/4HANA as its core ERP system. The primary challenge was to establish a seamless, real-time data flow between S/4HANA and the 3PL warehouse operations system to support visibility across the supply chain and ensure operational efficiency. Secondary challenges included system integration, real-time data synchronization, data volume management, data integrity, performance optimization and error handling and recovery.

Image
Key Challenges

 

Initially, a comprehensive analysis of both the client’s S/4HANA and the 3PL WMS systems was undertaken to identify critical integration points and delineate precise data flow requirements. Then, a robust technical architecture was designed, incorporating suitable integration patterns to facilitate seamless data exchange.

The development phase involved the configuration of the SAP Process Integration/Orchestration (PI/PO) landscape across multiple environments to support development, testing, and production activities. Integration scenarios were developed and subjected to rigorous unit testing. To optimize data extraction, custom ABAP extractors and triggers were implemented within the S/4HANA system.

Comprehensive testing was executed to validate the integration’s functionality, performance, and scalability under diverse conditions. User acceptance testing was conducted with key stakeholders to ensure alignment with business requirements.

Deployment followed a staged rollout approach, prioritizing non-critical data flows initially and progressively introducing real-time integrations for critical processes. Post-go-live, dedicated hypercare support was provided to address any emergent issues and ensure a smooth transition.

Orchestrating a seamless integration

The heart of the integration focused on five key areas:

  • Technical solution architecture: We designed and implemented a comprehensive solution leveraging SAP’s Process Integration and Orchestration (PI/PO) platform, which also included an enterprise service repository, integration builder, and runtime workbench.
  • Data transfer mechanisms: To effectively handle the large volumes of data, two primary transfer mechanisms – batch processing and delta mechanics – were implemented.
  • Data mapping and transformation: This comprehensive approach ensured data integrity across systems and improved the efficiency of integration development and maintenance, giving the client the ability to adapt quickly to changing business requirements.
  • API integration: To manage the API lifecycle effectively, SAP API Management was introduced, with robust capabilities for API versioning, traffic management, and usage analytics.
  • Error handing and monitoring: Delivered via a custom error handling framework using the SAP PI/PO exception subprocess feature, real-time monitoring dashboard utilizing SAP Fiori, and automated alerts.
One of the largest manufacturers of PVC pipe needed a trusted partner to integrate its SAP S/4HANA platform with 3PL warehouse management systems, generating operational efficiencies.

Improved technical and business advantages

The integration project yielded substantial technical and business advantages for the client. Near real-time data synchronization was established between SAP S/4HANA and the 3PL WMS, with minimal latency for critical transactions. The system adeptly handled high volumes of data, including inventory movements, sales orders, and purchase orders.

Data accuracy significantly improved, reducing discrepancies between S/4HANA and the WMS. The optimized integration process alleviated SAP system load during peak periods, enhancing overall system performance. Error management was streamlined with automated error recovery, minimizing manual intervention. Finally, real-time visibility into inventory and order status through custom Fiori apps empowered stakeholders with data-driven decision-making.

Several technical lessons were learned and best practices identified throughout the project, including:

  • A modular approach to integration scenario design enhanced maintainability and adaptability for future enhancements
  • Implementing intelligent caching for frequently access masted data optimized system performance by reducing the load on both SAP and 3PL systems.
  • Asynchronous communication patterns for non-critical updates improved system responsiveness.
  • Robust data validation at multiple levels ensured data integrity.
  • Regular monitoring and tuning of SAP PI/PO, and database query enhancements, were crucial for maintaining high performance.
  • Comprehensive documentation and version control of integration artifacts were essential for troubleshooting and future development.

Building upon this successful integration, the client is now exploring new, innovative advancements for supply chain optimization.

Loading...